Yes — Noosa has tree-canopy and character overlays that affect panel placement on some properties. We assess this at the site visit.
001 Sunshine Coast suburbs we cover
South, central, north, hinterland.
002 Why Sunshine Coast homes choose Cube
Designed for actual yield,
not nameplate.
A well-oriented 10 kW system in Noosaville produces noticeably more than the same system in Logan. We design for what your roof actually does.
Best-in-state irradiance
We size for real-world yield. The brochure number is the floor, not the ceiling.
Coastal + hinterland
Salt-spec in Mooloolaba, steep-pitch tile in Maleny — same crew, same standard.
Local presence
Sunshine Coast service tech based on-coast. Not driving up from Brisbane every time.
Council nuance
Noosa and Sunshine Coast Council planning rules — we know them.
003 A typical Sunshine Coast setup
The fastest payback
of the three regions.
Typical four-person home running aircon and a pool. Highest annual yield of our three service regions.
004 Recent Sunshine Coast installs
Three jobs from the last 90 days.
005 Sunshine Coast FAQs
Three quick ones.
Are Noosa Council solar rules different?
Do you install in the Hinterland?
Yes — Maleny, Montville, Mapleton, Eumundi, Cooroy and surrounds. No travel fee.
How long is the wait for Energex connection on the Sunshine Coast?
5–10 business days for standard residential. Sometimes longer for hinterland properties on the network edge.